The Itaipu Dam is a hydroelectric dam on the Paraná River, on the border between Brazil and Paraguay.
Itaipu, as the dam and its power plant are usually called, is one of the largest hydroelectric power plants in the world. The Itaipu Dam is one of the Civil Engineering Wonders chosen by the American Society of Civil Engineers.
The Itaipu Dam is on the Paraná River, on the border between Brazil and Paraguay, just north of the cities of Foz do Iguaçu in Brazil and Ciudad del Este in Paraguay.
The Brazilian visitor centre of the Itaipu Dam is 12 km (7.5 mi) from the centre of Foz do Iguaçu. From the Itaipu visitor centre in Foz do Iguaçu, the Friendship Bridge to Ciudad del Este is 6 km (3.7 mi) away, and Iguazu Falls is 38 km (24 mi) away.
The Itaipu reservoir, the lake held back by the dam, stretches about 160 km (100 mi) north along the Paraná River.
The Itaipu Dam is in both Brazil and Paraguay because the dam crosses the Paraná River, which forms the border between the two countries.
Foz do Iguaçu, in the state of Paraná, is the city at the Brazilian end of the Itaipu Dam. The Paraguayan end of the Itaipu Dam is in the city of Hernandarias, in the department of Alto Paraná.
Itaipu has a visitor centre on each side of the border. The Paraguayan visitor centre of Itaipu is in Hernandarias, about 14 km (8.7 mi) north of the Friendship Bridge.
The following ways of travelling reach the Itaipu Dam.
Vila C, the Foz do Iguaçu neighbourhood that buses 101 and 102 are named after, began in 1975 as housing, put up by Itaipu Binacional, for the workers who built the Itaipu Dam.
The reservoir of the Itaipu Dam flooded the traditional land of the Avá-Guarani, an Indigenous people of the Paraná valley. In March 2025, Brazil's Supreme Court approved an agreement for Itaipu Binacional to buy about 3,000 hectares (7,413 acres) of land for the Avá-Guarani as a historical reparation.
While the Itaipu reservoir filled, a rescue operation called Mymba Kuera saved 36,450 animals from the rising water.
The Itaipu Dam was built to generate electricity for Brazil and Paraguay from the water of the Paraná River.
The plan for Itaipu began with the Act of Iguaçu (Ata do Iguaçu), signed on 22 June 1966 by Juracy Magalhães and Raúl Sapena Pastor, the foreign ministers of Brazil and Paraguay. In the Act of Iguaçu, Brazil and Paraguay agreed to study the shared use of the Paraná's water power, from the Sete Quedas waterfalls down to the mouth of the Iguaçu River.
The Act of Iguaçu also ended a border dispute over the land around the Sete Quedas, which dated back to a treaty between Portugal and Spain in 1750. The reservoir planned under the Act of Iguaçu was to flood the disputed land, which settled the argument.
Brazil and Paraguay signed the Treaty of Itaipu on 26 April 1973, setting the terms for building the dam and dividing its electricity between the two countries.
The Itaipu Dam was built between 1975 and 1984.
About 40,000 people worked on the Itaipu building site at the busiest time of construction.
On 20 October 1978, 58 tonnes (64 US tons) of dynamite blew up the cofferdams, the temporary walls that held the Paraná River back from a new bypass channel 2 km (1.2 mi) long. The Paraná River then flowed through the bypass channel, which left the old riverbed dry for building the main dam of Itaipu.
On 14 November 1978, 7,207 m³ (254,515 cu ft) of concrete went into the Itaipu Dam in a single day, enough to build a ten-storey building every hour.
The spillway gates of the Itaipu Dam closed on 13 October 1982, which filled the Itaipu reservoir in 14 days.
The first generating unit of Itaipu began producing electricity on 5 May 1984. Itaipu's 18th generating unit started in 1991. Generating units 19 and 20, the last two at Itaipu, started in 2006 and 2007.
106 workers died in accidents on the Itaipu Dam building site between 1978 and 1984, according to Itaipu Binacional.
The Itaipu building site had 43,530 workplace accidents between 1978 and 1984, by the same official count.
Antônio Fernandes Neto, a former safety technician at Itaipu, said the building site's records pointed to up to 800 deaths. Fernandes Neto also said the records were destroyed in two fires.
The Guaíra Falls disappeared under the water of the Itaipu reservoir on 27 October 1982.
Before 1982, the Guaíra Falls were a chain of 18 waterfalls on the Paraná River at the Brazil-Paraguay border, near the town of Guaíra, with a total drop of about 114 m (374 ft). The Portuguese name of the Guaíra Falls, Sete Quedas (Seven Falls), counted only the seven main waterfalls.
The Guaíra Falls probably had the greatest volume of falling water of any waterfall in the world, according to Britannica. Seven to nine times more water went over the Guaíra Falls than goes over Iguazu Falls.
The water that once fell over the Guaíra Falls now flows through the turbines of the Itaipu power plant.
The Itaipu Dam is a line of dams across the Paraná River, made up of a concrete main dam, the power plant, a spillway and side dams of earth and rock.
The Itaipu Dam is one of the highest and largest hollow gravity dams in the world, according to Britannica. A hollow gravity dam is a concrete dam with open spaces inside, which holds back water by its own weight.
Itaipu's main dam is as high as a 65-storey building.
Concrete in the Itaipu Dam adds up to 12.7 million m³ (449 million cu ft), enough to build 210 stadiums the size of the Maracanã in Rio de Janeiro. The iron and steel in Itaipu are enough to build 380 Eiffel Towers.
The Itaipu reservoir holds 29 billion m³ (1 trillion cu ft) of water.
No, the Itaipu Dam is not the largest dam in the world, although Itaipu has produced more electricity in total than any other power plant.
The Three Gorges Dam in China is the largest hydroelectric power plant in the world, with an installed capacity of 22,500 MW. Installed capacity is the maximum electricity a power plant produces at once, measured in megawatts (MW). The Baihetan Dam, also in China, is the second-largest hydroelectric power plant in the world, with 16,000 MW, ahead of Itaipu in third place.
Itaipu held the world record for the most electricity produced by a power plant in one year, 103.1 TWh (billion kilowatt-hours) in 2016. The Three Gorges Dam broke Itaipu's record in 2020, with 111.8 TWh.
On 10 March 2024, Itaipu passed 3 billion MWh (3,000 TWh) of electricity produced since 1984, which Guinness World Records certified in 2024 as the largest total energy production of any power plant in the world.
The Itaipu Dam produces about 90 TWh (90 billion kilowatt-hours) of electricity in an average year.
Itaipu produced 72.9 TWh of electricity in 2025, according to Itaipu Binacional. Paraguay took 36% of Itaipu's electricity in 2025, enough to cover about 87% of Paraguay's needs. Brazil took the other 64% of Itaipu's 2025 output, about 7% of the electricity used in Brazil.
Tours from both sides of the border take visitors to see the Itaipu Dam and the power plant that makes its electricity.
The main sights of the Itaipu Dam are the viewpoints over the main dam and the spillway, the inside of the power plant, the night lighting of the dam, the Itaipu Ecomuseum and the Bela Vista Biological Refuge.
The Central Viewpoint (Mirante Central) is the main lookout over the Itaipu Dam. Buses on the Itaipu Panoramic tour, from the Brazilian visitor centre, stop at the Central Viewpoint.
The Panoramic tour bus also passes the penstocks, the giant white pipes that carry water down from the reservoir to the turbines, and drives along the top of the dam.
At its top, the Itaipu Dam stands 225 m (738 ft) above sea level.
The spillway of the Itaipu Dam is a giant concrete chute that lets excess water out of the reservoir, at up to 62,200 m³ (2.2 million cu ft) per second. At full flow, the Itaipu spillway carries 40 times the average flow of Iguazu Falls.
The Spillway Viewpoint (Mirante do Vertedouro) is the other stop on the Itaipu Panoramic tour, which passes the spillway twice.
Itaipu's spillway opens only when rain fills the reservoir above its normal level. From December 2023 to November 2025, the Itaipu spillway stayed shut for almost two years.
The inside of the Itaipu power plant is open to visitors on the Itaipu Special tour, which goes to the Concrete Cathedrals, the Central Control Room, the generator gallery, and the turbine shaft.
The Concrete Cathedrals are the huge hollow chambers inside the concrete of the main dam of Itaipu.
Itaipu's Central Control Room is the operations centre of the power plant. A yellow line across the floor of the Central Control Room marks the border between Brazil and Paraguay. Every technician at Itaipu speaks both Spanish and Portuguese, because the staff of Itaipu come from both Brazil and Paraguay.
The generator gallery is a corridor about 1 km (0.6 mi) long that runs past the generating units of Itaipu.
Itaipu Illuminated (Itaipu Iluminada) is a night tour of the Itaipu Dam on Friday and Saturday evenings, when lights pick out the main dam in the dark.
Most of the 2-hour Itaipu Illuminated tour takes place at the Central Viewpoint, where a band plays live music from the triple border region of Brazil, Paraguay and Argentina.
The Itaipu Illuminated Special tour adds a stop at the penstocks and dinner at the Mirante do Lago restaurant, in about 4 hours.
The Itaipu Ecomuseum is a free museum on Avenida Tancredo Neves in Foz do Iguaçu about the history, culture, and wildlife of the border region around Itaipu.
The Itaipu Ecomuseum holds the following exhibitions.
The Itaipu Bela Vista Biological Refuge is a nature reserve and wildlife centre of Itaipu Binacional in Foz do Iguaçu, home to animals such as jaguars, harpy eagles, tapirs, otters and capybaras.
A visit to the Bela Vista Biological Refuge starts with a drive through the forest and along the reservoir shore. The Bela Vista visit then follows a 2 km (1.2 mi) walking trail past more than 15 animal enclosures, where you plant a native tree.
About 24 million native tree seedlings have been planted around the Itaipu reservoir.
The Bela Vista Biological Refuge is open to visitors from Wednesday to Monday, on guided visits of about 2 hours 30 minutes.
Every visit to the dam itself on the Brazilian side of Itaipu is a guided bus tour from the Itaipu Visitor Reception Center on Avenida Tancredo Neves in Foz do Iguaçu, after a security check.
Tickets for the Itaipu tours on the Brazilian side are sold online by Turismo Itaipu, the official tourism service of Itaipu in Brazil.
The best time to visit the Itaipu Dam is in the morning, when the heat is milder and the views are clearer for photos.
The Itaipu Panoramic tour runs every day, all year round.
Allow 1 hour 10 minutes for the Itaipu Panoramic tour, or 2 hours 30 minutes for the Itaipu Special tour, plus 30 minutes before a Special tour to register.
Allow extra time for waits at the stops on the Itaipu tours, which sometimes last 35 minutes or more.
A visit to the Itaipu Dam costs BRL 63 (about USD 12) on the Itaipu Panoramic tour and BRL 185 (about USD 36) on the Itaipu Special tour, while visits on the Paraguayan side are free.
Adult tickets for the other Itaipu tours on the Brazilian side cost the following.
Half-price tickets for the Itaipu tours are only for Brazilian students and people with disabilities. Residents of the towns next to the Itaipu reservoir pay half price or less.
Yes, you can go inside the Itaipu Dam on the Itaipu Special tour, the only tour that enters the power plant.
The Itaipu Special tour has a limited number of places each day. The Special tour is open only to visitors aged 14 and over. Bring an official photo ID to join the Itaipu Special tour.
Wear closed shoes with a strap at the heel on the Itaipu Special tour, with a heel of 3 cm (1.2 in) or lower. Long skirts and wide-legged trousers are unsuitable on the Special tour, so wear shorts or trousers.
Bags and backpacks are banned on the Itaipu Special tour. Lockers at the Itaipu visitor centre cost BRL 10.
Yes, you can visit the Itaipu Dam from Paraguay, where tours of the power plant from the visitor centre in Hernandarias are free.
Tours of the Itaipu power plant on the Paraguayan side leave every hour from 8 am to 4 pm, every day. Bring a passport or national ID card to join an Itaipu tour in Paraguay.
The Paraguayan tour of Itaipu starts with a film about the dam and a scale model of the Itaipu Dam, followed by a bus tour with stops for photos.
On the Paraguayan side, the Itaipu Dam is lit up on Friday and Saturday evenings in a show called Iluminación Monumental (Monumental Lighting). The Museo de la Tierra Guaraní (Museum of the Guaraní Land), on the Paraguayan side of Itaipu, is open from Tuesday to Sunday.
The road from Foz do Iguaçu to the Paraguayan side of the Itaipu Dam crosses the Friendship Bridge into Ciudad del Este.
Use the following travel tips to get the most out of a visit to the Itaipu Dam.
Most hotels near the Itaipu Dam are in central Foz do Iguaçu and along Avenida das Cataratas, the road from the city to Iguazu Falls.
The following hostels in central Foz do Iguaçu are the budget choices near the Itaipu Dam.
The following mid-range hotel stands in central Foz do Iguaçu.
The following luxury hotels stand on Avenida das Cataratas and inside Iguaçu National Park.
Itaipu is pronounced ee-tye-POO, with the stress on the last syllable.
Itaipu is the Portuguese spelling of the name, used in Brazil. The Spanish spelling of the name, used in Paraguay, is Itaipú, with an accent on the final u to mark the same stressed last syllable.
Itaipu means "the stone that sings" in Guarani, from ita, meaning stone, and pu, meaning sound. Guarani is an Indigenous language of South America, spoken alongside Spanish in Paraguay.
The Itaipu Dam takes its name from an island called Itaipu, which stood in the Paraná River at the building site of the dam.
Brazil and Paraguay own the Itaipu Dam together, through Itaipu Binacional, the company the two countries set up in May 1974 to build and run the dam.
Under the Treaty of Itaipu, Paraguay owns half of the electricity the dam produces. Paraguay sells the unused part of its half of Itaipu's electricity only to Brazil, at prices set under the treaty.
Itaipu Binacional has a director general from Brazil and a director general from Paraguay.
Yes, the Itaipu Dam is one of the seven Civil Engineering Wonders.
Itaipu is the only one of the seven Civil Engineering Wonders in South America. The other six Civil Engineering Wonders are the Channel Tunnel, the CN Tower, the Delta Works, the Empire State Building, the Panama Canal, and the Golden Gate Bridge.
Itaipú is a piece for chorus and orchestra by the American composer Philip Glass, written in 1989 about the Itaipu Dam.
Philip Glass's Itaipú has four movements, called Mato Grosso, The Lake, The Dam, and To the Sea. The chorus in Itaipú sings a Guarani creation myth in the Guarani language.
The Atlanta Symphony Orchestra, conducted by Robert Shaw, gave the first performance of Itaipú on 2 November 1989.